Secondary school 01 Sep 2025 An artist impression of BCE's new co-educational secondary college. The Windsor Inner North Secondary School (WINSS) project is a strategic response to the growing demand for co-educational secondary education in Brisbane’s inner-city region. It is part of BCE’s 20-year ‘New School Development Schedule’ which identified the inner north of Brisbane as a priority location for additional school infrastructure. The proposed school, planned to be opened in 2029, is being designed with students' futures in mind - blending innovation, sustainability, and wellbeing into every aspect of the campus by aligning with the vision of Pope Francis’ Laudato Si’.A significant amount of work has been conducted on the prosed future school including:Architectural plans, elevations, and sectionsEducational briefAcoustic, fire, landscape, and structural reportsESD (Environmentally Sustainable Design) reportPreliminary building certification assessmentsCost estimates and engineering servicesOne of the key components of the WINSS project is its commitment to Pope Francis’ encyclical, Laudato Si, delivering a school design that is sustainable through net-zero operational carbon emissions. This includes:Passive design strategiesFaçade optimisation through parametric modellingThermal and visual comfort enhancementsEnergy-efficient envelope designAn Educational Brief has been developed to allow the project architect Hayball, to design a comprehensive masterplan aligning with the following areas: Functional area schedulesWellness provisions including central hubs and distributed spacesFeedback from stakeholder workshopsThe project will soon be lodged for Ministerial Planning approval, with further updates to be provided.View from Terrace, showcasing Library warmth, maximum glazing, nominal vertical blades and clear city view.View from Roblane Street. Grounded brick plinth with wholeness of form above.
21 Jan 2025 Former Student Cheryl Bell Returns To Lead Much Loved St Flannan’s School Former Student Cheryl Bell Returns To Lead Much Loved St Flannan’s School Tagged with Click through to Former Student Cheryl Bell Returns To Lead Much Loved St Flannan’s School 19 Jan 2025 Building Strong Foundations One Future Student At A Time Building Strong Foundations One Future Student At A Time Tagged with Click through to Building Strong Foundations One Future Student At A Time 17 Jan 2025 Mr Mac shares his vision for St Peter’s Primary School Mr Mac shares his vision for St Peter’s Primary School Tagged with Click through to Mr Mac shares his vision for St Peter’s Primary School 15 Jan 2025 Bce Schools Respond To Growing Demand For Prep Enrolments St Mary’s School Beaudesert Bce Schools Respond To Growing Demand For Prep Enrolments St Mary’s School Beaudesert Tagged with Click through to Bce Schools Respond To Growing Demand For Prep Enrolments St Mary’s School Beaudesert PagePrevious 31 32 33 34 35 36 37
21 Jan 2025 Former Student Cheryl Bell Returns To Lead Much Loved St Flannan’s School Former Student Cheryl Bell Returns To Lead Much Loved St Flannan’s School Tagged with Click through to Former Student Cheryl Bell Returns To Lead Much Loved St Flannan’s School
19 Jan 2025 Building Strong Foundations One Future Student At A Time Building Strong Foundations One Future Student At A Time Tagged with Click through to Building Strong Foundations One Future Student At A Time
17 Jan 2025 Mr Mac shares his vision for St Peter’s Primary School Mr Mac shares his vision for St Peter’s Primary School Tagged with Click through to Mr Mac shares his vision for St Peter’s Primary School
15 Jan 2025 Bce Schools Respond To Growing Demand For Prep Enrolments St Mary’s School Beaudesert Bce Schools Respond To Growing Demand For Prep Enrolments St Mary’s School Beaudesert Tagged with Click through to Bce Schools Respond To Growing Demand For Prep Enrolments St Mary’s School Beaudesert